Is $10,000 Enough for a Kitchen Remodel in Columbia, MD?
Quick answer
No, not for a full kitchen. In Columbia and across Howard County, a small, straightforward kitchen with us usually runs $20,000 to $40,000, and that's with the layout staying the way it is. A $10,000 budget points toward updating part of a kitchen, not replacing the whole thing.
By Dan Millard, owner of American Kitchen Concepts in Columbia, MD (MHIC 34049)
I opened American Kitchen Concepts in February 1993, a month after Sears closed its home improvement business and left me without a job. In 33 years of building kitchens around Columbia and Ellicott City, I've learned the most useful thing I can do for someone with a number in mind is tell them what it covers.
So here it is. $10,000 won't cover a full kitchen with me and my crew. Your kitchen may well be worth doing. The math just doesn't work at that number, and I'd rather walk you through it now than have you find out halfway through a project.
What a kitchen remodel costs in Columbia and Howard County
Every kitchen gets priced on its own, but I can tell you where most of them land. These are the ranges I use when someone asks me for a ballpark.
| Kitchen | What it usually looks like | Typical range |
|---|---|---|
| Small, straightforward | A townhome-size kitchen where the layout stays and nothing moves | $20,000 to $40,000 |
| Medium | More cabinets, more counter, more floor | $40,000 to $80,000 |
| Large or reworked | Moving plumbing and electrical, or rearranging the design and layout | $80,000 to $120,000 |
If you've got a small kitchen and you're keeping everything where it is, you're not going to be at $120,000. You're going to be much, much less. The real number comes from measuring your kitchen and going through the selections with me.
Why $10,000 falls short
I build every quote off a checklist I call my tickler. It goes item by item: yes or no, how many, how much. When you see it line by line, it's easier to understand where a budget goes.
Take a small kitchen. Demo starts around $1,000. If there's a 20-foot soffit coming down, that's roughly another $400. Setting 10 cabinets is about $500 in carpentry. Then there's drywall, electrical, tile, flooring, and the plumbing hookups. That's all labor, and we haven't bought a single cabinet or countertop yet. Add those in and you can see how a straightforward small kitchen starts at $20,000.
On a big, complex job, the labor alone can reach $50,000. Most of our jobs are the more involved kind, because most of the homes I work in are 30 to 50 years old.
What drives the price
- Demo
- A basic fee starting around $1,000 for a quick, one-day tearout. A heavier demo can run three times that, because it's three times the work.
- Floors you're keeping
- If the floor stays, my crew has to protect it, and that's a charge. If it's all coming up, there's nothing to protect.
- Soffits
- That's the boxed-in area over the cabinets. It's priced by the foot, around $20 a foot. Twenty feet of soffit is about $400 before anything new goes in.
- Old tile on the walls
- Taking off an existing tile backsplash is a per-square-foot rate.
- Drywall
- How much comes down, how much goes back up, and every hole we cut to run electrical back to the panel that has to be patched.
- Cabinet installation
- Carpentry runs about $50 per cabinet. A 10-cabinet kitchen and a 20-cabinet kitchen are different jobs.
- Backsplash and floor tile
- Per square foot, for materials and installation.
- Plumbing hookups
- A single-bowl sink or a double, a water line to the refrigerator. Each one is a yes, a no, and a quantity.
- Cabinet tier
- Stock, semi-custom, or custom. This is the biggest material decision you'll make.
- What's behind the walls
- On one Columbia job, the homeowner found mold during demo. We traced it to a leaking window, replaced the exterior wall, and then picked the kitchen back up. You can't price that until the wall is open.
Stock, semi-custom, or custom cabinets
In the cabinet world there are three tiers: stock, semi-custom, and custom. For most of my clients, semi-custom meets or exceeds what they need, so my main line is Bishop, a semi-custom cabinet. There's rarely a reason to go custom. You can build a $2 million house today and it'll have stock cabinets in it.
When someone needs to save money, I've always been able to drop them down to a stock line. That still works, but the savings aren't what they were. Stock cabinets have gone up 30 to 35 percent in recent years with tariffs and shipping. A mid-tier line I carry has climbed so much that it now costs more than the Bishop semi-custom, which is the better cabinet at the lower price.
What's in a full kitchen remodel with us
- Design and selections with me in the showroom: cabinets, countertops (granite, Cambria, Silestone, and Q Quartz), flooring, backsplash, sink, and faucet
- Demo, including soffit removal and protecting any flooring that stays
- Drywall, electrical, recessed lighting, and under-cabinet lighting
- Cabinet installation by the same crew that's been with me for 15 years
- Countertops measured after the cabinets are set, then installed
- Tile backsplash and flooring, including LVT or LVP (luxury vinyl tile or plank) and hardwood that we sand in place to match the rooms next to the kitchen
- Sink, faucet, and appliance hookups
- Appliance coordination. You buy from the wholesaler directly, and I schedule the delivery around the job
- A 2-year labor guarantee on everything we touch
A Columbia kitchen, start to finish
This kitchen is in Columbia, and it's a good look at where the money goes on a real job. We removed the soffits, cabinets, and counters, then installed new wall cabinets all the way to the ceiling. Granite countertops and a new backsplash went in, along with recessed lights, under-cabinet lighting, and lights over the island overhang. We reinstalled the homeowners' existing appliances to finish it out.
Compare that with a job we did in Ellicott City. The homeowners wanted a more open space, so we took out the wall between the kitchen and family room and removed the soffits to raise the cabinet height. The project included new cabinets, countertops, appliances, flooring, lighting, drywall, and paint in several rooms. Once you're moving walls and opening rooms up, you're in the upper ranges.
A small kitchen still has real scope
Small doesn't mean simple. Peggy's kitchen in Towson was small, with an old enclosed breezeway off one side that always made the space feel chopped up. The work was figuring out how to connect the two.
"Dan had great ideas for improving our kitchen. We have a small kitchen, but then it is extended with a breezeway that was enclosed a long time ago. It always seemed so chopped up, but Dan found a way to connect the two rooms better. He directed us in a way so that now we have a beautiful kitchen. Dan has many great ideas. He was always extremely responsive when we had questions. The crew was courteous and detail oriented. We love the materials and colors of our new kitchen, and it seems much bigger. We highly recommend American Kitchen Concepts for kitchen renovation."
You can read more from homeowners on our customer reviews page.
What $10,000 can do
If $10,000 is the whole budget, you're looking at part of the kitchen. We did one in Laurel where the owners wanted more market value without a complete remodel. That job was new counters, updated plumbing fixtures, a tile backsplash, and fresh paint. It isn't a new kitchen, and I won't pretend it is.
If your number is closer to $20,000 and the layout is staying put, that's where a small kitchen with us starts. Either way, I'd rather you know that before we sit down than after.
Why the number is what it is
When you hire us, you're getting me and my crew. Nobody else has my crew. They've been with me for 15 years, and they know how I operate. You work with me from the first meeting through the last day, not with a salesperson who hands you off.
When we finish, there's no punch list. We don't leave a list of 3, 5, or 10 things to come back and adjust, because we get them right while we're there. My license number is 34049. The guy getting his license today has an extra digit, so that number tells you how long I've been doing this.
You can see everything we handle on our kitchen remodeling services page.
Frequently asked questions
What is the average cost of a kitchen remodel in Maryland?
I can only speak for the kitchens I build in Columbia and around Howard County, and here the honest answer is a range. A small, straightforward kitchen runs about $20,000 to $40,000, a medium kitchen $40,000 to $80,000, and a large kitchen or one where the layout and utilities move runs $80,000 to $120,000. A typical full kitchen with us sits somewhere around $60,000 to $80,000.
What is the biggest expense in a kitchen remodel?
Labor adds up faster than people expect. On a complex job, once you total the demo, drywall, carpentry, tile, and plumbing hookups, you can be at $50,000 in labor. On the material side, the cabinet line is the lever I use when someone needs to bring the number down.
In what order should a kitchen remodel be done?
It starts with design and selections. Cabinets, countertops, floor, backsplash, and fixtures get picked in the showroom before anything comes apart. Then comes demo and the work behind the walls, then cabinets, then countertops, which get measured once the cabinets are in. My lead installer runs the site day to day, and I handle the timing on cabinet delivery, countertop measuring, and appliance delivery so nothing shows up too early or too late.
What not to do when renovating a kitchen?
Don't pick a contractor on the lowest number alone, and don't sign with a salesperson you'll never see again. Ask who will actually be in your kitchen every day. And don't pay for custom cabinets you don't need. For most of my clients, semi-custom meets or exceeds what they want.
What is a reasonable budget for a kitchen remodel?
Start by being honest about size and scope. If the kitchen is small and nothing is moving, $20,000 to $40,000 is a reasonable number to plan around. If you want to take down a wall or move plumbing and electrical, plan for the upper ranges.
Can I save money with stock cabinets?
Some, but less than you used to. Stock cabinet lines have gone up about 30 to 35 percent in recent years because of tariffs and shipping costs. One mid-tier line I carry now costs more than my semi-custom line, and the semi-custom is the better cabinet.
What happens if something goes wrong after the job is done?
Everything we touch carries a 2-year labor guarantee. Maryland law requires 90 days, and the industry standard is usually 12 months. Cabinets and countertops also carry their manufacturer warranties, and we're the first call on those too.
Bring me your number
If you're in Columbia or anywhere in Howard County, including the 21044 side of Columbia where we've done several recent kitchens, call me and tell me what you're working with. I'll tell you honestly where your kitchen falls. We're by appointment, Monday through Friday, and you'll sit down with me in the showroom at 9150 Rumsey Road.
Dan Millard, owner, American Kitchen Concepts, Inc.
